[bsa_pro_ad_space id=14]
The Tesla Cybertruck has become the latest model to roll off the US electric-car giant’s production line – almost 18 months later than first planned and amid doubts it will be sold in Australia.
The first road-going version of the long-awaited Tesla Cybertruck has rolled off the production line nearly 18 months after first planned – but production of the US electric-car giant’s first pick-up isn’t expected to reach maximum capacity until 2024.
In a post shared to Twitter, Tesla announced the first Cybertruck has been built at its new factory in Austin, Texas – near the company’s global headquarters.
First unveiled in prototype form in late 2019, the Tesla Cybertruck’s start of production has been almost four years in the making.
At the time, Tesla claimed production would begin in late 2021, though numerous delays – largely attributed to the COVID-19 pandemic – pushed its launch back to mid-2023.
Since the Cybertruck concept’s unveiling, Tesla has been beaten to the title of the first road-legal electric pick-up in the US – trailing the Rivian R1T (September 2021) and Ford F-150 Lightning (April 2022).
Mass production of the Cybertruck in significant numbers is not due to begin until 2024, reports have claimed – as the first examples of new models initially roll out of factory doors in small numbers and few model grades, before an expansion of the model range and a production increase in the months that follow.
Prices for the Tesla Cybertruck are also yet to be announced for the US, as company CEO Elon Musk previously said final prices and specifications for the electric pick-up could be confirmed in August or September 2023 – after the prices released in 2019 were pulled two years later.
While the Tesla Cybertruck has been caught on camera in New Zealand for testing, doubt has been cast over plans to sell the electric pick-up in Australia – and if it will be produced in right-hand drive for local roads.
The electric-car giant announced in May 2023 it would not produce the updated Model S sedan and Model X SUV in right-hand drive – ruling them out from the Australian market, though they will remain on sale in the right-hand-drive UK and Japanese markets where new left-hand-drive vehicles can still be registered and sold.
Automotive industry experts have raised concerns the Tesla Cybertruck’s angular design will not easily meet local and European pedestrian protection rules.
Tesla previously allowed Australian customers to place a $150 deposit for the Cybertruck until May 2022. The company is yet to confirm if the vehicle will still be sold locally.
[bsa_pro_ad_space id=15]


